![DL/T5210.3-2009电力建设施工质量验收及评价规程第3部分:汽轮发电机组(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/812/33688812/b_33688812.jpg)
4.7 Water Cooled Condenser Assembly and Erection
4.7.1 Condenser(steam exhaust device)erection.
Applicable scope:applicable to condenser(steam exhaust device)erection,with the following inspection items:condenser(steam exhaust device)shell assembly,condenser(steam exhaust device)in place and alignment.
1 Condenser(steam exhaust device)shell assembly inspection and acceptance are given in Table 4.7.1-1
Table 4.7.1-1 Condenser(steam exhaust device)shell assembly
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_289.jpg?sign=1738812670-DCT0bJw47HPgmf7pLMGW930e4C8CdMwu-0-cb82fd845aa7e31536b388dbe458b823)
2 Condenser(steam exhaust device)in place and alignment inspection and acceptance are given in Table 4.7.1-2.
Table 4.7.1-2 Condenser(steam exhaust device)in place and alignment
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_290.jpg?sign=1738812670-dMftl4N07CkvqX35Bsjmg6N4suMKLSDb-0-68a0f30bd466e31b7c6feb0adc66b8a2)
4.7.2 Condenser cooling tube bundle erection inspection and acceptance are given in Table 4.7.2.
Table 4.7.2 Condenser cooling tube bundle erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_291.jpg?sign=1738812670-skgOLRgbzbeWYdatrNoMjCj3dYuwrHMk-0-ce0e82ee81da3d4beac92f5dce72098c)
Table 4.7.2(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_292.jpg?sign=1738812670-1HPDM1enmFLCv23sgoZmJGGR9Mu6VelS-0-ffa93049eeb55277fa0d5549501aa56d)
4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test inspection and acceptance are given in Table 4.7.3.
Table 4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_293.jpg?sign=1738812670-njE7VDwucHIXNEkVSidlo3avJXcSzBiU-0-4b5fc67d05acdd54a24c23c5a8d49c91)
4.7.4 Condenser(steam exhaust device)accessories erection and secondary grouting inspection and acceptance are given in Table 4.7.4.
Table 4.7.4 Condenser(steam exhaust device)accessories erection and Secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_294.jpg?sign=1738812670-Q6pmApMgeLhR5kTvB0s6D3FTPZBS0N9U-0-31a88470aeee05c439fda432f738f81b)
4.7.5 Rubber ball cleaner inspection and erection inspection and acceptance are given in Table 4.7.5.
Table 4.7.5 Rubber Ball Cleaner Inspection and Erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_295.jpg?sign=1738812670-4uW3cHgB8L6x5AbKjigsJc2sI6kg4LZ7-0-a5d874deaa43d8bab6afac1784d9fc5f)
4.7.6 Mandatory provision implementation inspection of water cooled condenser assembly erection is given in Table 4.7.6.
Table 4.7.6 Mandatory provision implementation inspection table of water cooled condenser assembly erection subsection project
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_296.jpg?sign=1738812670-rnGEbqWRiaWEe5GM2gEwTWzDc24pVadx-0-70596f70cbbcae60fad55b6d2b7ab106)