6.11 Head Bending Rail and Intermediate Rail
Ⅰ Dominant Item
6.11.1 Preset thermal expansion gap for rail joints must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation.
Ⅱ General Item
6.11.2 Installation for head bending rail shall take chain blade of head wheel as reference;tolerance for installation of the bending rail shall meet requirements in Table 6.11.2,see Figure 6.11.2.
Check quantity:to check all.
Inspection method:see Table 6.11.2.
Table 6.11.2 Tolerance for installation of head bending rail


Figure 6.11.2 Head bending rail
1-Chain wheel;2-Head bending rail;3-Longitudinal centerline of sintering equipment
6.11.3 Tolerance for intermediate rail shall meet requirements in Table 6.11.3.
Check quantity:to check all.
Inspection method:see Table 6.11.3.
Table 6.11.3 Tolerance for installation of intermediate rail